design revision round per  stage calculated? 

two design stages
two approval gates​

02

design stages

02

approval gates

floor plans & concept
3D visualization & materials​

definition

one revision round

01

submitted 
design version

01

consolidated
feedback set

01

update
design version

Client rep centralizes feedback into the active design version.


Piecemeal messages
won’t create a new revision round.

​

a visision round begins only after StudioCore receives a complete, locked set of consolidated feedback.

Phase 01

floor plan & concept

the initial presentation is V0

feedback o1

feedback o2

v0
1st proposal
not counted as a revision
V1
after round 01
V2
after round 02

maximum of 02 round

unused rounds do not carry over to the next phase

​

​

approval gate

gate D1

D1
APPROVED
FLOOR PLAN
1. document name
2. version
3. date of approval
4. approved by
5. content/sections approved

the approval email must clearly state all 05 of these key information points

progression to 3d visualization & materials only occurs with confimed, specific ver approval.

​

​

Phase 02

3d visualization & materials

the initial presentation is V0

v0
1st proposal
not counted as a revision
V1
after round 01
V2
after round 02

maximum of 02 round

unused rounds do not carry over to the next phase

​

​

feedback 01

feedback 02

approval gate

gate D2
& modification requests

approval email requires the same 5 pieces of infomation as D1
D2 Approved
3D / materials
correct approved version
TECHNICAL
DRAWINGS PACK
changes after approval or exceedling 2 rev rounds
MODIFICATION
REQUESTS
fee & timeline approval required before execution

technical drawings implement the approved plan; no new design options.
error corrections by StudioCore do not count as revision rounds

​​

​​

responsibilities

who locks the feedbacks?

Client
Rep
​
  • consolidates feedback from all stakeholders

  • locks a complete set of feedback for the specific design version

Studio
Core
​
  • releases design versions and maintains a project log

  • confirms approval gate completion prior to advancing stages

save this timeline before sending your design feedback
 

​

​